-
...Pipe Installation In Massive Structures Crossing Pipe jacking is a trenchless method of new pipe installation Factory made pipe sections are jacked or pushed behind the tunnel boring machine or other tunnel excavation methods. Jacking force is tran smitted from thrust wall installed in the drive shaft. Pipe...
...Pipe Installation In Massive Structures Crossing Pipe jacking is a trenchless method of new pipe installation Factory made pipe sections are jacked or pushed behind the tunnel boring machine or other tunnel excavation methods. Jacking force is tran smitted from thrust wall installed in the drive shaft. Pipe... more
Place of Origin:CHINA
Minimum Order Quantity:NOT LIMITED
Price:USD EUR
-
...creating a path for the installation of a new pipe. This innovative technique has gained popularity due to its efficiency, accuracy, and minimal disruption to the surrounding area. Equipment Specialized Pipe Ramming Equipment is required for this method of
...creating a path for the installation of a new pipe. This innovative technique has gained popularity due to its efficiency, accuracy, and minimal disruption to the surrounding area. Equipment Specialized Pipe Ramming Equipment is required for this method of more
Brand Name:Longway
Model Number:BH700
Place of Origin:China
12-100 Inches Pipe Diameter Casing Hammer For Engineering Rescue And Tamping
-
...Pipes is their versatility in installation methods. These pipes can be installed using trenchless methods or open trench installation, providing flexibility and convenience for various project requirements. Whether you need a quick and cost-effective installation or a traditional trenching approach, HDPE Water Supply Pipes...
...Pipes is their versatility in installation methods. These pipes can be installed using trenchless methods or open trench installation, providing flexibility and convenience for various project requirements. Whether you need a quick and cost-effective installation or a traditional trenching approach, HDPE Water Supply Pipes... more
Brand Name:HAIYANG
Model Number:HWHP-250312
Place Of Origin:China Jiangsu
DIN 8074/8075 Standard HDPE Water Supply Pipes with 1.25mpa-2.5mpa Pressure Rating
-
... of the installation hole design of the toilet seat.Toilet on the location of the installation, use a pencil to draw the need to the position of the mounting holes in the ground at the bottom of the hole location and contour, and then remove the toilet,
-
...Install PE Blister Manure Leakage Slurry Pipe Plug for 200mm Pipes - Ensures Efficient Manure Management Introduction: Blistered manure is an efficient and effective method of flushing manure out of pig houses and directing it to sedimentation or septic tanks through drainage ditches. This method involves using water flow to flush the manure out of the house and into the designated tank. Common methods...
...Install PE Blister Manure Leakage Slurry Pipe Plug for 200mm Pipes - Ensures Efficient Manure Management Introduction: Blistered manure is an efficient and effective method of flushing manure out of pig houses and directing it to sedimentation or septic tanks through drainage ditches. This method involves using water flow to flush the manure out of the house and into the designated tank. Common methods... more
Brand Name:Hongum
Model Number:Customized
Place of Origin:China
Easy-to-Install PE Blister Manure Leakage Slurry Pipe Plug for 200mm Pipes - Ensures Efficient Manure Management
-
...curve of water pipe, stainless steel tee is divided into Y-shaped tee, reducing tee and high-pressure tee, etc. Stainless steel tee is the most common and reliable connection pipe of stainless steel pipe. The connection methods of stainless steel tee and
...curve of water pipe, stainless steel tee is divided into Y-shaped tee, reducing tee and high-pressure tee, etc. Stainless steel tee is the most common and reliable connection pipe of stainless steel pipe. The connection methods of stainless steel tee and more
Brand Name:Stainless steel tee
Model Number:LJ-PF324
Place of Origin:China
Joining Pipe Lines Sch80 DN6 NPS 1/8 Stainless Steel Tee
-
...Method Polyurethane Insulation Pipe line,High Efficiency Casing Pipe product Product Description gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Technical Prameters: PE-365/760 PE-420/960 PE-850/1372 PE-960/1680 Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33 Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680 capacity (kg/h) 550-700 550-700 700-900 800-1200 Installed...
...Method Polyurethane Insulation Pipe line,High Efficiency Casing Pipe product Product Description gas/oil /water pipeline Puf Pre-Insulated Pipe PE shell casing plastic Machinery Technical Prameters: PE-365/760 PE-420/960 PE-850/1372 PE-960/1680 Main extruder SJ-90/33 SJ-90/33 SJ-120/33 SJ-150/33 Pipe diameter (mm) Φ365-960 Φ420-960 Φ850-1372 Φ960-1680 capacity (kg/h) 550-700 550-700 700-900 800-1200 Installed... more
Brand Name:Huashida
Place of Origin:China
Certification:CE, Rohs,TUV
Pipe Dia 960-1680mm Pre Insulated Pipe Production Line 800-1200Kg/H
-
...Pipe with Electricity Construction 75mm, 90mm, 110mm, 125mm, 160mm, 180,200mm, 250mm, 315mm, 400mm, 500MM, 630mm International cooperation Pipe, pipe fittings can be connected by adhesive, simple construction method, convenient operation, high installation efficiency. PE drainage Definition: PE(polyethylene) material is widely used in pipe...
...Pipe with Electricity Construction 75mm, 90mm, 110mm, 125mm, 160mm, 180,200mm, 250mm, 315mm, 400mm, 500MM, 630mm International cooperation Pipe, pipe fittings can be connected by adhesive, simple construction method, convenient operation, high installation efficiency. PE drainage Definition: PE(polyethylene) material is widely used in pipe... more
Brand Name:QIUPU
Model Number:PVC
Place of Origin:WENZHOU
CPVC Electrical Conduit Pipe for Cable Protection
-
...Pipe Clamp Product Description: The installation method of dust pipe and flanging pipe connection clamp can be quick opening or bolt, you can choose the one suitable for you.The clamp system is easy, quick, adjustable and reusable. Connect two flanged pipes...
...Pipe Clamp Product Description: The installation method of dust pipe and flanging pipe connection clamp can be quick opening or bolt, you can choose the one suitable for you.The clamp system is easy, quick, adjustable and reusable. Connect two flanged pipes... more
Brand Name:SN
Model Number:YP-LC16010
Place of Origin:HEBEI
120mm Durable Air Duct Bolt Adjustable OEM Galvanized Pipe Clamp
-
... Simple cutting method, fast speed, save a lot of working time; 4. Provide portable working methods and design cutting schemes according to the workplace (site); 5. High safety, do not need to move the pipe by hand when working; 6. No sparks and dust will
... Simple cutting method, fast speed, save a lot of working time; 4. Provide portable working methods and design cutting schemes according to the workplace (site); 5. High safety, do not need to move the pipe by hand when working; 6. No sparks and dust will more
Brand Name:Hengyang
Model Number:MC-455AL
Place of Origin:Jiangsu China
2900r/min Automatic Pipe Saw Cutting Machine Plastic Pipe Cutter
-
... into pipe threads and matching them with threaded pipes to form a non welded flange connection. This connection method has the advantages of easy installation and maintenance, especially suitable for use on pipelines that are not allowed to be welded on
-
... diameter pipe, make the line turning Angle Material Cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon luo drain, PVC, PPR, etc Creation Method Pushing, pressing, forging, casting, etc Manufacturer's Standard ANSI, ISO, JIS,
... diameter pipe, make the line turning Angle Material Cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon luo drain, PVC, PPR, etc Creation Method Pushing, pressing, forging, casting, etc Manufacturer's Standard ANSI, ISO, JIS, more
Model Number:DN8-DN1200
Place of Origin:Cangzhou, China (Mainland)
Minimum Order Quantity:1 Piece/Pieces
pipe elbow 90 degree dimensions
-
METAL Forged Steel Pipe Threadolet A182 F52 F53 F55 1" 2" 3" 4" 3000LB 6000LB 9000LB sturdy olet Threaded Connection: Threadolet uses a threaded connection method, which facilitates quick installation and removal. Diverse Materials: ...
-
...pipe beveling machine, pipe beveling machine, external clamp type automatic beveling machine. Product performance The external clamp beveling machine is designed for bevel processing of the end face of small diameter pipes in narrow workshops. Completely cold working method, external card positioning installation...
...pipe beveling machine, pipe beveling machine, external clamp type automatic beveling machine. Product performance The external clamp beveling machine is designed for bevel processing of the end face of small diameter pipes in narrow workshops. Completely cold working method, external card positioning installation... more
Brand Name:Wellnit
Model Number:ISO
Place of Origin:China
Outer Clamp Electric Pipe Beveling Machine Chamfering Automatic Feed
-
...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Service Life 2.Corrosion Resistance 3.Good Flexibility 4.Excellent Shock Resistance 5.Good Wear Resistance 6.Small Flow Resistance 7.Good Environmental Performance 8.Safe and Reliable Connection Method Aplication Area PP-R pipe installation
...Pipe White Red Color Pn20 Kitchen Water Supply System Tube Description List MPA(Pressure) Size(mm) Thinckness(mm) PN2.0 20 2.8 25 3.5 32 4.4 40 5.5 50 6.9 63 8.7 75 10.3 90 12.3 110 15.1 Advantages 1.Long Service Life 2.Corrosion Resistance 3.Good Flexibility 4.Excellent Shock Resistance 5.Good Wear Resistance 6.Small Flow Resistance 7.Good Environmental Performance 8.Safe and Reliable Connection Method Aplication Area PP-R pipe installation more
Brand Name:CR
Model Number:PPR PIPE
Place of Origin:China
Pn20 Polypropylene Random Pipe Kitchen Water Supply System Tube
-
... connection point between the pipeline and any other components in the system. One of the key advantages of using a Rubber Lined Pipe is its excellent corrosion resistance. The rubber coating provides a protective layer that helps prevent the buildup of
-
...pipe connector Product introduction The installation method of right angle vertical metal joint is somewhat similar to that of T-type straight joint. It only need one pair of M6 * 25 bolts to complete the installation process. The surface of right angle vertical joint can be provided with holes to further drive self-tapping screws to strengthen the fixation of the pipe...
...pipe connector Product introduction The installation method of right angle vertical metal joint is somewhat similar to that of T-type straight joint. It only need one pair of M6 * 25 bolts to complete the installation process. The surface of right angle vertical joint can be provided with holes to further drive self-tapping screws to strengthen the fixation of the pipe... more
Brand Name:Lief Technology
Model Number:W-20
Place of Origin:China
Fixed Type Double Pipe Connector Stamping for lean pipe system
-
...PRODUCT PROFILE Dismantling joint is specially designed to provide an easy method of removing or installing any kind of flanged product in a pipeline, such as valves, pumps, flanged pipe fittings or other similar products. Final anchoring is ensured by ...
...PRODUCT PROFILE Dismantling joint is specially designed to provide an easy method of removing or installing any kind of flanged product in a pipeline, such as valves, pumps, flanged pipe fittings or other similar products. Final anchoring is ensured by ... more
Brand Name:ZW
Place of Origin:China
Certification:CE / ACS
Ductile Iron Water Pipe Fittings Dismantling Joint PN10-PN25
-
...Pipe Heavy Duty Double Braided Exhaust Flex Pipe With Ends Extensions 2.0x4x8" Diameter (IN) : 2" Length (IN) : 8" Finish : Natural Color : Silver Material : Stainless Steel Mesh With Aluminized end tubing Applicable to Exhaust pipe Inlet 2 inch. installation method: weld Usage: 1) Flexible pipe, automobile exhaust system component 2) Installed...
...Pipe Heavy Duty Double Braided Exhaust Flex Pipe With Ends Extensions 2.0x4x8" Diameter (IN) : 2" Length (IN) : 8" Finish : Natural Color : Silver Material : Stainless Steel Mesh With Aluminized end tubing Applicable to Exhaust pipe Inlet 2 inch. installation method: weld Usage: 1) Flexible pipe, automobile exhaust system component 2) Installed... more
Brand Name:YP
Model Number:YP-EXF200
Place of Origin:Hebei
Heavy Duty Double 2.0x4x8" Braided Exhaust Flex Pipe With Ends Extensions
-
...Pipe Fitting Elbow Butt weld elbows use resistance heating to simultaneously weld two workpieces together along the entire end face. Field installation usually adopts two methods of resistance butt welding and flash butt welding. Butt welding elbow is a kind of elbow formed by hot pressing of steel or by forging technology. The connection method is the butt welding of the elbow pipe and the steel pipe...
...Pipe Fitting Elbow Butt weld elbows use resistance heating to simultaneously weld two workpieces together along the entire end face. Field installation usually adopts two methods of resistance butt welding and flash butt welding. Butt welding elbow is a kind of elbow formed by hot pressing of steel or by forging technology. The connection method is the butt welding of the elbow pipe and the steel pipe... more
Brand Name:HH Carbon Steel Bend
Model Number:DN15-DN1200 Carbon Steel Bend
Place of Origin:Hebei, China
ASTM Butt Weld 90 Degree Carbon Steel Pipe Elbow EN10253 Standard